Iceriver ks5m launched in May 2024, using KHeavyHash algorithm, can mine KAS Coin and SDR Coin, Iceriver ks5m hash rate of 15Th/s, power consumption of 3400W.
Parameters of Iceriver KS5M
Manufacturer | Iceriver |
Model | KS5M Miner |
Release | May 2024 |
Hashrate, Th/s | 15Th/s |
Power on wall @25°C, Watt | 3400W |
Power efficiency on wall @25°C, J/Mh | 227J/Th |
Noise Level | 75db |
Fan(s) | 2 |
Algorithm | Cryptocurrency | KHeavyHash Algorithm | KAS |
Detailed Characteristics
Power Supply
Power supply AC Input voltage range V | 170-300V AC |
Power supply AC Input Frequency Range, Hz | 40Hz/70Hz |
Power supply AC Input current, Amp |
Hardware Configuration
Quantity of hash chips | |
Quantity of hash boards | |
Networking connection mode | RJ45 Ethernet 10/100M |
Miner Size (Length*Width*Height, w/o package),mm | 370 x 195 x 290mm |
Miner Size (Length*Width*Height, with package),mm | 468 x 279 x 386mm |
Net weight, kg | 15 |
Gross weight, kg | 17 |
Environment Requirements
Operation temperature,°C | 5 – 40 °C |
Storage temperature,°C | -10~60 |
Operation humidity(non-condensing) , RH | 10 – 90 % |
Iceriver KS5M, suitable for Large-scale mining
Iceriver KS5M has a whopping 15 terabytes of computing power. Despite its power consumption of 3400W, its efficiency is amazing compared to its powerful computing power. The combination of Iceriver KS5M and KAS digital currency contributes to the future of the digital currency world.
Every operation unlocks endless potential. The power consumption of 3400W shows the perfect balance of high efficiency and energy saving.
Additional Information
丨Buying guide
1. Website prices do not include shipping, customs fees, and taxes, for some countries, we can provide a low-price declaration as well as DDP service.
2. Product display is for reference only, the actual shipping version may change due to manufacturer updates.
3. X-ON MINING protects customer information, ensures the safety of customer transactions, and has cooperated with asicminervalue, asicminercompare, asicprices and other brands, with a high degree of reliability.
丨Shipping details
1. We will arrange the delivery of full payment orders according to the principle of payment order.
2. For pre-order orders, subject to the factory delivery date, X-ON MINING will inform the customer in time and follow up on the order at any time.
3. Need to buy additional power supply, chassis, water cooling air cooling system, please contact our salesman for detailed communication.
4. We provide verified video before delivery to ensure the normal operation of the machine.
丨Warranty
1. For new ASIC miners, iceriver provides a warranty policy of up to 180 days from the date of delivery.
2. In warranty time, the customer bears the postage to send back, iceriver bears the postage to send back to the customer; For machines outside the warranty, the customer needs to pay for maintenance and postage.
3. No warranty is provided for damage caused by failure to follow instructions, or damage caused by disassembly/modification of the system without consent.
4. Under normal circumstances, the maintenance cycle is about one week to complete the repair and return.
5. See the full list of terms at www.iceriver.io.
Reviews
There are no reviews yet.