Bitmain ANTRACK AR31 200kW Hydro Miner Rack Dry Cooling System

Bitmain ANTRACK AR31 transforms idle data center infrastructure into profitable Bitcoin mining operations. Contact our team today to discuss pricing, availability, and how this solution can unlock new revenue from your existing facility.

$20,000.00

Not Fitting Your Site?

Tell us your mining capacity and site requirements, and we’ll recommend the right hydro-cooling container for your deployment.

Facebook
Twitter
LinkedIn
Pinterest
VK
Reddit

Modular 200kW hydro cooling cabinet with heat recovery function for Antminer

CONTAINER CAPACITY

ASIC MINERS

20 Units

Maximum loading capacity

POWER

200kw

High-power Container

VOLTAGE

380–480V

AC 50/60Hz

FORM FACTOR

47U

1.2 × 1.0 × 2.3 m dimensions

AVAILABILITY       In stock, ready to ship • DDP Sea Shipping Available

Compatible Models

Bitmain ANTRACK AR31 200kW Hydro Miner Rack Data Center Monetization Solution

The Bitmain ANTRACK AR31 is a data center-ready 200kW hydro cooling system designed to monetize stranded capacity in standard data centers. Utilizing surplus electrical capacity and underfilled racks, it transforms idle facility infrastructure into highly profitable, high-density Bitcoin mining operations—with zero structural modification.

With native 47U dimensions and independent dry-cooling loops, the AR31 integrates cleanly into modern white-space environments. Expand compute capacity modularly as power becomes available, without modifying existing facility piping.

Monetize Stranded Data Center Capacity

Turn Idle Infrastructure Into Bitcoin Mining Revenue

Data centers often have surplus power and underfilled racks. The ANTRACK AR31 turns that stranded capacity into a revenue-generating asset:

  • Zero structural modification – integrates into existing white space

  • Uses surplus electrical capacity – no new power infrastructure required

  • Fills underfilled racks – maximize revenue per square foot

  • Rapid deployment – start mining without facility redesign

The result: Idle data center capacity becomes a profitable Bitcoin mining operation.

Modular Rack-by-Rack Expansion

Scale Rack by Rack: Turn Available Power Into BTC

The AR31 is designed for modular growth:

  • Native 47U dimensions – fits standard data center racks

  • Independent dry-cooling loops – no facility piping modifications

  • Clean integration – modern white-space compatible

  • Expand as power becomes available – grow at your own pace

  • No existing facility piping changes – plug-and-play deployment

Deploy one rack. Add more as your power budget grows.

Bitmain ANTRACK AR31

Bitmain ANTRACK AR31 Parameters

Without package

With package

Weight

L:1000mm、W:1200mm、H:2300mm L:1070mm、W:1380mm、H:2400mm 750KG

Specification

Model ANTRACK AR31 Installed capacity 20 units ANTMINER (U2 Hydro)
or 14 units ANTMINER (Hydro)
Miner maximum load,kW 200 kW Total load,kW 215
Power supply AC input voltage,Volt 380~480VAC Power supply AC input frequency range,Hz 50~60
Maximum power supply AC input current,Amp 326 @380V
270 @480V
Size (Length*Width*Height),mm (without package) 1,200*2,250*2,300 Size (Length*Width*Height),mm (with package) 1,250*2,320*2,400
Net weight,kg (without package) 550 Gross weight,kg (with package) 700
Power supply AC input voltage,Volt 380~480VAC Power supply AC input frequency range,Hz 50~60
Maximum power supply AC input current,Amp 15.8 @380V
14.8 @480V
Fan Rated power,kW 4.1 *2 @380V
4.7 *2 @480V
Weight 400 kg
Dimensions 120 × 100 × 230 cm

Reviews

There are no reviews yet.

Be the first to review “Bitmain ANTRACK AR31 200kW Hydro Miner Rack Dry Cooling System”

Where Is ANTRACK Applicable?

Supply power

1. Supply power

Provide a heat source

2. Provide a heat source

INSIDE DATA CENTERS

3. INSIDE DATA CENTERS

ANTRACK AR30 200kW — Hydronic Heating Heat Recovery

Recover up to 200kW of waste heat from high-density computing. An isolated plate heat exchanger delivers 60°C–80°C hot water for building and process heating.

Applications

  • District Heating & Multi-Building Networks — Up to 200kW for commercial buildings, campuses, and residential areas.

  • Swimming Pools & Aquatic Centers — Continuous pool water heating, less conventional heating needed.

  • Aquaculture & Livestock — Stable water and space heating for RAS, aquaculture, and livestock facilities.

CTA: Contact us for a heat recovery assessment.

FAQs

The Bitmain ANTRACK AR31 is a 200kW hydro cooling system designed specifically for data center environments. It allows operators to monetize stranded capacity—surplus electrical capacity and underfilled racks—by transforming idle facility infrastructure into high-density Bitcoin mining operations with zero structural modification .

Data centers often have surplus power and underfilled racks. The AR31 turns that stranded capacity into a revenue-generating asset :

Challenge AR31 Solution
Surplus electrical capacity Uses existing power infrastructure
Underfilled racks Maximizes revenue per square foot
Complex facility modifications Zero structural modification required
Slow deployment Rapid deployment without facility redesign

The result: Idle data center capacity becomes a profitable Bitcoin mining operation.

As a 47U rack system, the AR31 is designed to house multiple hydro-cooled miners. The specific miner capacity depends on the model and configuration. For detailed capacity information, please contact an authorized Bitmain distributor.

The AR31 is designed for seamless integration into modern data center environments :

  • Native 47U dimensions – fits standard data center racks

  • Independent dry-cooling loops – no facility piping modifications required

  • Clean integration – compatible with modern white-space environments

  • No existing facility piping changes – plug-and-play deployment

Stranded capacity refers to underutilized resources in data centers—specifically surplus electrical capacity and underfilled racks. The AR31 addresses this by :

  • Using surplus electrical capacity – no new power infrastructure required

  • Filling underfilled racks – maximize revenue per square foot

  • Enabling rapid deployment – start mining without facility redesign

No. The AR31 requires zero structural modification to the facility . It integrates into existing white space using native 47U dimensions, and its independent dry-cooling loops eliminate the need for facility piping changes.

Scroll to Top

Get The Discount and Latest Price Now

Contact us today to access your custom offer and VIP benefits!

Customize Your Hydro Cooling Solution

Share your requirements below. Our consultant will contact you via email, WhatsApp, or call within 24 hours with a custom setup and quote.