X-ON MINING Immersion Cooling B100 Cluster for Crypto Mining
——Provide from miner Home Mining to Large-scale Mining Solutions
Scalable design – High profitability – Fast delivery
Immersion Cooling B100 Cluster – 1MW Industrial Mining Solution
Technical Specifications
Feature | Specification | Industry Advantage |
---|---|---|
System Dimensions | 11.8m × 2.2m × 2.35m (38.7′ × 7.2′ × 7.7′) | Compact design saves 25% floor space vs conventional systems |
Miner Capacity | 200 ASIC miners | Supports mixed fleets, including latest 5nm rigs |
Modular Design | 10 × B100 Tanks | Scales from 100kW to 1MW+ with identical racks |
Cooling Capacity | 1MW total dissipation | Maintains chips at optimal 55°C for maximum hashrate |
Coolant System | 7,000L dielectric fluid Dual-loop optional |
30% better thermal transfer than single-loop systems |
Power Efficiency | 100kW operating power 1,437kW max load |
Dynamic power adjustment saves $15k/year per cluster |
Advanced Features
- ✔ Smart Dry Cooling: Zero water consumption with 40°C ambient tolerance
- ✔ Global Voltage: 350-480V 3-phase (50/60Hz) ready for any grid
- ✔ Extreme Environment: -25°C to 48°C ambient range
- ✔ Enterprise Monitoring: Web portal + SNMP/email alerts + LED status
Why This Beats Air Cooling
→ 45% lower energy costs
→ 3× longer miner lifespan
→ 80% noise reduction
Recommended Configurations
- Litecoin Farm: 200 × L7 (9.5GH) @ 0.2J/MH
- Bitcoin Expansion: 160 × S21 Hyd @ 15J/TH
- Hosting Service: Mixed 200-rig deployment
Certifications & Compliance
- UL 1995 Certified
- CE Marked for EU
- IP67 Rated components
Immersion Cooling B100 Cluster – Complete 1MW Solution
(Now with ROI Calculator & Deployment Guide)
Technical Specifications
Category | Specification | Competitive Edge |
---|---|---|
Physical Dimensions | 11.8m × 2.2m × 2.35m (38.7′ × 7.2′ × 7.7′) | 25% space savings vs. air-cooled setups |
Miner Capacity | 200 ASICs (L7/S21/Whatsminer) | Payback period: 8-14 months (see ROI) |
Cooling Performance | 1MW capacity @ 0.08kW/ASIC | 45°C stable chip temp (vs. 70°C+ with air) |
Power System | 350-480V 3-phase (50/60Hz) | Saves $18,000/year vs. air cooling* |
ROI Comparison
(Based on 200 x Antminer S21 @ $0.07/kWh)
Metric | B100 Cluster | Air Cooling | Savings |
---|---|---|---|
Energy Cost/Month | $9,800 | $17,600 | $7,800 |
Miner Lifespan | 4+ years | 2.5 years | +60% |
Hashrate Stability | 99% | 92% | +7% yield |
Annual Savings | $93,600 | – | – |
*Assumes 24/7 operation, 5% overclocking headroom
Installation Requirements
1. Space Preparation
- Level concrete floor (min. 5,000kg/m² load capacity)
- 3m clearance for maintenance access
- Ambient temp control (<35°C recommended)
2. Power & Plumbing
- Dedicated 1,500A 480V circuit (or step-down transformer)
- Dry cooler exhaust ducting (optional for indoor)
- 4″ coolant fill/drain ports (stainless steel)
3. Deployment Timeline
- Day 1-3: Site inspection & power hookup
- Day 4: Crane-assisted tank placement (2hrs)
- Day 5: Coolant fill & leak testing
- Day 6: Miner installation + 24hr burn-in
4. Remote Monitoring Setup
- SNMP v3 configuration (provided)
- Cloud portal onboarding (30min training)
Products of The Same Series:
Reviews
There are no reviews yet.