Immersion Cooling BC40 Elite 1MW Crypto Mining Solution

The Immersion Cooling BC40 Elite is suitable for 98% of mining equipment and supports 200 miners with a capacity of 1MW. The strong cooling effect and modular design enable rapid deployment and efficient space saving.

The price of miner changes from time to time. Price may be low or high.  Please consult us for the specific price, we will give you the best price in the market.

Facebook
Twitter
LinkedIn
Pinterest
VK
Reddit

IMMERSION MINING BC40 Elite Support 200 Miners large-scale mining construction solutions

Immersion Cooling BC40 Elite Container

BC40 Elite Key Advantages

🔥 98% Miner Compatibility – Supports all major ASICs (Antminer, Whatsminer, Avalon)
⚡ 1MW Cooling Capacity – maintains 200 miners at peak efficiency
🌎 Global Deployment Ready – -25°C to 48°C ambient range


Technical Specifications

Category Specification Operational Benefit
Dimensions 40′ Container: 12.2m × 2.44m × 2.9m Standard shipping size (no special permits)
Miner Capacity 200× S21 / 180× T21 / 160× S21 Imm Optimized density for mixed fleets
Cooling System 10× B100 Tanks (530L each) + 7,000L total Dual-loop redundancy for zero downtime
Power Efficiency 1,437kW max load 58-93kW idle
Smart Controls 10× Smart PDUs + Integrated power meters Real-time per-rig energy tracking
Saves $42k/year vs. air cooling

Certifications: UL/CE (Meets NA & EU safety standards)


ROI Breakdown

(Based on 200× Antminer S21 @ $0.07/kWh)

Metric BC40 Elite Traditional Air Cooling Advantage
Cooling Energy Use 93kW 165kW 44% reduction
Annual OpEx $57,000 $101,000 $44k saved
Miner Lifespan 5+ years 3 years +66% longevity
Deployment Time 3 days 2+ weeks 80% faster

Calculations assume 24/7 operation at design temp (35°C)

BC40 Elite Container Immersion Cooling BC40 Elite BC40 Elite BC40 Elite
Immersion Cooling BC40 Elite BC40 Elite
✅ Compact Modular Design

  • Integrated container + dry cooler system saves 30% more space than traditional setups

✅ Plug-and-Play Deployment

  • All-in-one solution reduces installation time by 80%
  • Ready for mining in under 48 hours

✅ Industrial-Grade Efficiency

  • Maintains full 1MW cooling capacity in just 40ft standard container footprint

Key Benefit: Maximize your mining ROI with faster deployment and higher density than air-cooled alternatives!

✅ All-in-One Design

  • Freely switch between single-phase (200-277V) and three-phase (350-480V) power without hardware changes—compatible with different miners.

✅ Global Compatibility

  • Supports voltage standards in North America, Europe, Asia, and more for worry-free deployment.

✅ Mixed Miner Support

  • Run both older and newer miners (e.g., S19 & S21) in the same tank, maximizing farm efficiency.

✅ Smart Monitoring

  • Real-time power tracking per miner with automatic alerts—reducing maintenance costs.

Installation & Deployment

1. Site Requirements

  • Foundation: Level concrete pad (min. 10,000kg/m²)
  • Power: 2,000A 480V 3-phase input (or step-down transformer)
  • Clearance: 1m side access for maintenance

2. Plug-and-Play Components
✔ Pre-assembled dry cooler (top-mounted)
✔ Quick-connect coolant hoses (color-coded)
✔ Miner racks with tool-less mounting

3. Commissioning Process

  • Day 1: Crane placement + power hookup
  • Day 2: Coolant fill & pressure testing
  • Day 3: Miner installation + 24hr burn-in

4. Remote Management

  • SNMPv3 monitoring with cloud dashboard
  • Automated email/SMS alerts for faults

Why This Outperforms

✅ All-in-One Design – No field assembly required
✅ Military-Grade Durability – 10-year service life
✅ Future-Proof – Upgradable for next-gen 3nm ASICs

Ideal For:

  • Mining farms scaling to 5MW+
  • Hosting providers offering immersion services
  • Enterprises pursuing ESG compliance

 

Dimensions 1219.2 × 243.8 × 289.6 cm

Reviews

There are no reviews yet.

Be the first to review “Immersion Cooling BC40 Elite 1MW Crypto Mining Solution”
Scroll to Top

Get The Discount and Latest Price Now

Join us we will send you the latest quotes every day